Springwell School in Hartlepool were having several issues with equipment breakdowns and the overall condition of the kitchen.
We were asked to carry out a full refurbishment to bring the kitchen up to current standards.
Our works included,
- Altro hygienic wall coverings
- Polysafe hygienic flooring
- Firesafe roller shutter
- Stainless steel full ventilation system
-
New commercial catering equipment with energy saving and carbon reducing qualities.
